- Temporary entrances are to be removed within 120 days of application approval.
- If the entrance is to be installed by the applicant/contractor all specifications must be approved by Manager of Roads prior to installation.
- Entrance shall not be used as a means of access to any other type of establishment than indicated without Township approval.
Non-commercial entrance platforms are to be a minimum of 6 metres wide, unless otherwise agreed upon and with a longer pipe, allowing the ends to be exposed by 30cm (minimum)
Entrance Material must be 200mm (8 inches) of 5/8 inch crushed stone, minimum depth.
Only new, high density polyethylene (HDPE) smooth interior dual-wall pipe or new corrugated steel pipe is to be used, unless otherwise approved (HDPE O.P.S.S. 1840 or CSP O.P.S.S. 1801).