Road Construction and Closures

With over 330 km, roads are one of the Township's biggest assets. The goal is to extend the life of our road assets where possible and to renew or rebuild where necessary.

We are working towards converting our gravel roads to limestone. We are also addressing culvert replacements, pulverizing, reconstruction, geotextile, patching, surface treatment and asphalt paving.

The Operations department is committed to multi-year road reconstruction projects and taking a long-term approach to allow for planned maintenance and improvements.

See the Municipal 511 map below for real-time updates (or the list of projects below for road work planned this season.  Please note projects may be delayed due to unforeseen circumstances, such as weather and supply chain issues.  The Township askes that drivers plan their routes accordingly and obey all signs and traffic controls in work zones to ensure the safety of workers.

Construction and Roadwork

Contractors conducting work within our Township are encouraged to follow the Clean Equipment Protocol for Industry.

For any upcoming road construction, signage is posted to let residents know of the expected completion dates. To see what we are working on this year view our Quarterly Work Plan below.

Oversize Load Permit

To help maintain the Township's road network and infrastructure, weight restrictions may be imposed on certain roads.

We recognize that sometimes the movement of heavy or oversize loads may be required. Apply for an Oversize Load permit if you need to transport an oversize load; there is a fee for this service.

Dimensions & total Axle Weights

Temporary Road Closing or Road Use Request

If your organization is planning a special event that requires the temporary closure of a road or a portion thereof, or the use of a road, please complete the Temporary Road Closing or Road Use Request form at least 15 business days prior to the start of your proposed event.  Along with your request form, a map, certificate of insurance and traffic management plan will need to be included documents.

 

The 2025 Quarterly Workplan for Roads

Please note, Quarterly Workplan for Roads under the Operations department is subject to change due to weather events, scheduling and manpower. 

2025 Operations Work Plan: Roads, Bridges, Drains, Fleet
Period Road Maintenance Capital Projects Bridges and Municipal Drains Fleet

Q. 1.
Jan. - Mar.

 

Procurement:

  • Granular
  • Winter Sand
  • Dust Suppressant x 2
  • Operational Services
  • Sign Replacements
  • Winter Maintenance & Snow Removal
  • Sign Changeover - Half Loads

 

Procurement:

  • Surface Treatment
  • Hot Mix Paving

Procurement::

  • Black Rapids Bridge Rehabilitation
  • Municipal Drain Grant Application & Reporting

 

Procurement:

  • Water Tank
  • 2 Mid-sized 4x4 Trucks
  • Rubber Tire Excavator
  • Mower
  • Truck Safety (Unit 24)
  • Trailers Safety (Units 35, 63, 66)

Q. 2

Apr. - Jun.

  • Gravel/Grading
  • Guide Posts & Rail Replacements 
  • Box Paving Hard Surface Roads
  • Patching & Shouldering
  • Culvert Replacements
  • Ditching & Brushing
    Mowing 1st Cut
  • Street Sweeping Villages and Intersections
  • Dust Suppressant
  • Roadside Weed Spraying
  • Sign Maintenance
  • Traffic Counting

  • Crack Sealing
  • Box Paving Hard Surface Roads
  • Line Painting
  • Gravel Road Updates (Kidd Rd N - #34 to Fairfax)
  • Street Sweeping Bridge Decks
  • OSIM Bridge Inspections
  • Municipal Drain Inspections
  • Fleet Inspections & Seasonal Changeover
  • Truck Safety (Units 8, 9, 39)
  • Trailer Safety (Units 67, 69)

Q.3
July - Sept.

  • Grading/Grading
  • Culvert replacements
  • Patching & Shouldering
  • Ditching
  • Brushing
  • Mowing 2nd cut
  • Washburn Road Rehabilitation
  • Furnace Falls Pathway Paving
  • Single Coat and Double Coat Surface Treatment applications
  • Black Rapids Bridge Rehabilitation
  • OSIM Bridge Inspections
  • Municipal Drain Inspections
  • Tire Inspections
  • Fleet Undercoating
  • Truck Safety (Units 10, 30, 31)
  • CVQR Renewal
  • Truck E Tests

Q. 4
Oct. - Dec.
  • Patching & Shouldering
  • Ditching
  • Catch Basin/Manholes/Storm Sewer Cleanouts
  • Brushing - If required
  • Winter Maintenance & Snow Removal
  • Budget Development

  • Budget Development
  • Bridge Development 
  • OSIM Bridge Inspections
  • Municipal Drain Reporting
  • Fleet Inspection & Seasonal Changeover
  • Truck Safety (Units 5, 12, 19, 20)
  • Licensing
  • MVIS Renewal
  • Budget Development

 

Sign up to our eNewsfeature

Stay up to date on the Township's activities, events, programs and operations by subscribing to our eNewsfeature.

This website uses cookies to enhance usability and provide you with a more personal experience. By using this website, you agree to our use of cookies as explained in our Privacy Policy.