Traffic Advisory | Construction Work on Hwy 401 at County Rd. 32 Underpass

Default Inteiror Banner

Road closure sign with 401 sign

Traffic Advisory | Construction Work on Hwy 401 at County Rd. 32 Underpass.

The following changes to traffic flow are anticipated:

Dates: July 20, 2025 to September 30, 2025
Time: 7 p.m. to 6 a.m.

Details:
ON Ramps & Hwy 401 at County Rd. 32
Nightly ramp closures NS-E Ramp (East Bound on-ramp) and NS-W Ramp (West Bound on-ramp).
Ramps will never be closed simultaneously, and advance notification signs will be posted in advance of closures.

During these nightly ramp closures, Hwy. 401 will be reduced to 1 through lane in either the East Bound or West Bound directions - only 1 direction will be affected at a time.

The Hwy. 401 off ramps (E-NS & W-NS) will remain open at all times.

 

Dates: October 1, 2025 to October 31, 2025
Time: 7 p.m. to 5 a.m.

Details:
COUNTY ROAD 32
Daily lane closures on top of the County Road 32 structure to facilitate the asphalt replacement operation.
Advance notification signs will be posted in advance of any lane closures.
At least 1 lane of traffic will remain open at all times on the structure.